University of Wisconsin–Madison

History

ME history wall

The ME150 History Wall was installed in the South entry to the Mechanical Engineering Building in November 2025.

For those who aren’t able to come see it in-person, please check out the digital Prezi tour here or view it as a PDF: ME150 History Wall

Timeline

Check out the timeline in its original form on Prezi or
view it as a PDF ME 150 timeline PDF